“We have now completed a full 12 months with our 30kW solar installation. The payback period, allowing for depreciation, is working out at 3.6 years – which is very pleasing. In fact the projected payback time is getting shorter each time we receive a bill; because what we are charged per unit of electricity has increased about 30% during 2013, which increases the $ savings. Since installation I think we have saved approx. $16,500... ...Comparing our 2013 annual consumption of Alinta-supplied electricity, to 2012 figures, we used approx. 40% less units.
“The decision was based on the professionalism of your company’s presentation and in particular the advice on where a 15kW and a 20kW system fitted into our usage.”
“Solargain PV Pty Ltd, under its Commercial Projects Manager, Craig Savill, recently completed the installation of a 130kw solar PV system on the roof of the Goldfields Oasis Leisure Centre, in Kalgoorlie-Boulder. The works were carried out expeditiously and with minimal issues. Craig and his team worked very cooperatively with our staff on-site and our consultant to ensure minimal disruption to operations at the centre.
“Many thanks again for your commitment; we have been very satisfied working with your team.”
“The yield from the system has so far been better than projected by Solargain. The monthly savings on our electricity bill are in excess of $1,500. A recent increase in our electricity rate has meant that the savings from the solar have also increased. I would recommend the combined solar PV and Solar Hot Water system as a comprehensive means of reducing supermarket energy costs.”
“Following consideration of the submissions and in accordance with the tender assessment criteria, the submission from Solargain is considered the highest quality of those received and most likely to result in the best outcome to the City. Solargain’s submission provided the highest level of savings to the city over a twenty five (25) year period (projected life of solar PV systems) as well as a comprehensive demonstrated understanding of project requirements which minimises potential risks associated with the project.